Completed projects

  • IKEA Ходынское Поле
    KEA Khodynskoye Pole
    IKEA Khodynskoe Pole - is the first urban-format store of the well-known Swedish chain. Located in the Moscow shopping complex Aviapark on an area of ​​7.7 thousand square meters.
  • Предприятие по производству ДОТФ АО "Сибур-Химпром"
    DOTF Production Enterprise
    The largest in Europe enterprise for the production of DOTF, located on the Perm site of SIBUR Company (the official launch was made in May 2019).
  • Курская АЭС
    Kursk Nuclear Power Plant
    A member of the POWER LEAGUE club (OAO VNIIR, Cheboksary) carried out the supply of power cabinets based on the solutions of the "RAM mcc" series.
  • Стадион "Калининград"
    Stadium "Kaliningrad"
    The stadium on the Oktyabrskiy Island in Kaliningrad was built specifically for the FIFA World Cup and is able to place up to 35,000 spectators at the same time.
  • Стадион "Ростов-Арена"
    Stadium "Rostov-Arena"
    The new stadium Rostov-Arena in Rostov-on-Don is one of the twelve arenas that were built or reconstructed for the FIFA World Cup 2018. It stands out from the other stadiums for its original architectural solution - the northern tribune is open and it overlooks the Don River. Also, a distinctive feature of Rostov-Arena is modern media facade, made along the whole perimeter of the structure.